An excavated slope is safe when the ground is stable. That is, the ... Benching and battering of excavation walls can minimise the risk of soil or rock slipping onto.

Get Quotes

Finding Level on Sloping Ground

Finding Level on Sloping Ground If you’ve ever built an outdoor structure that is set on posts with frost footings, it’s a pretty safe bet that the slope of the ground will vary from one footing to another.

Get Quotes

A Guide to OSHA Excavations Standard - Duke University

OSHA requires that in all excavations employees exposed to potential cave-ins must be protected by sloping or benching the sides of the excava- tion, by supporting the sides of the excavation, or by placing a shield between the side of the excavation and the work area.

Get Quotes

Trenching/Shoring/Excavations EXCAVATING, TRENCHING ...

sloping or benching the adjacent ground according to specific criteria dependent on the soil conditions, weather, and adjacent structures. 4. The total number of cave-in accidents is relatively small, however, the accidents which do occur are generally very serious and are much more likely to be fatal than other types of accidents in the

Get Quotes

Benching Battering and shoring - YouTube

What happens when we need to get into an excavation deeper than the 1.5m? Safe Work Autralia state that we need some form of protection so that it is safe to do so. This video show a few different ...

Get Quotes

Use a Box or Slope that Trench? - LHSFNA

Type A soil must be trenched at a 53 degree angle (nine inches back for every foot deep) except that a “short term” excavation of less than 12 feet in depth may be sloped at 63 degrees (a half foot back for each foot deep). Type B soil requires at least a 45 degree slope (one foot back for every foot deep),...

Get Quotes

Trench, Bench and Slope Safety - For Construction Pros

Improper operation of an excavator while trenching, sloping or benching can have a big impact on productivity and can potentially place both people and equipment at risk.

Get Quotes

Modulus 13 Quiz Flashcards | Quizlet

Benching system Safety net. ... OSHA has approved sloping, shoring, and benching to be used as safety systems in which one of these jobs? Road paving ... When the height of workplaces exceeds 30 feet above ground, what safety device must be provided for workers? Guardrails Personal fall protection

Get Quotes

TRENCHING & SHORING GUIDELINES

Shoring Types. Shoring is the provision of a support system for trench faces used to prevent movement of soil, underground utilities, roadways, and foundations. Shoring or shielding is used when the location or depth of the cut makes sloping back to the maximum allowable slope impractical.

Get Quotes

Appendix B - Sloping and Benching - Excavation - Subpart P

Appendix B - Sloping and Benching. The maximum allowable slope for a soil or rock deposit shall be determined from Table B-1 of this appendix. If that situation occurs, the slope shall be cut back to an actual slope which is at least ½ horizontal to one vertical (½H:1V) less steep than the maximum allowable slope.

Get Quotes

TRENCHING & SHORING GUIDELINES

Slope and Shield Configurations. Sloping and Benching Sloping Maximum allowable slopes for excavations less than 20 ft (6.09 m) based on soil type and angle to the horizontal are as follows: ALLOWABLE SLOPES. Soil type Height/Depth ratio Slope angle Stable Rock Vertical 90° Type A ¾:1 53° Type B 1:1 45° Type C 1½:1 34°

Get Quotes

STANDARDS FOR KEYING AND BENCHING OF EMBANKMENTS

sloping ground, especially in expansive soils and slopes floored in siltstone or shale, because this zone serves as a conduit for percolating water.

Get Quotes

Back to Basics: Sloping and Benching - Utility Contractor ...

Back to Basics: Sloping and Benching. OSHA requires type C soil to be sloped at 1½H:1V and it cannot be benched. This means that the slope must be cut back 1½ ft horizontally for every 1 ft of depth. The 1½:1 is equal to an angle of 34 degrees from the horizontal. As for type A soil, the slope must be ¾H:1V, or 53 degrees, and type B soil,...

Get Quotes

AFSCME | Chapter 4: Protective Systems

Chapter 4: Protective Systems. Sloping and benching are another means of protecting workers from cave-in hazards. Sloping is a method of cutting back the trench walls at such an angle that there is little chance of collapse. This is referred to as an "angle of repose", and must be suitable to the type of soil.

Get Quotes

How To Measure Grading Slope Around a House Foundation ...

How To Measure Grading Slope Around a House Foundation Using string and line level to measure ground slope 10′ from foundation. To ensure proper drainage, the ground around your home should slope approximately 6” downhill away from the house foundation over the first 10’ feet.

Get Quotes

how to build bench on sloped land - Composite Decking Price

To create seating using a sloped outdoor area for an amphitheater or chapel in the woods or backyard theater, the easiest type of bench to use is a simple plank bench ... Bench terraces - FAO

Get Quotes

Geotechnical Bulletin - Pages

The back slope of each bench is cut at a typical 1H:1V slope. This slope may need to be flattened based on the short term stability of the soils in the existing slope. If the existing slope is made up primarily of granular materials, a slope approaching 30° (approximately 1.75 H:1V) may be more appropriate.

Get Quotes

SLOPING AND BENCHING SYSTEMS - National Institute of ...

APPENDIX B ­ Simple Sloping Systems for TYPE A Soil For TYPE A soil and a trench depth of less than 20 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. This translates to a 0.75H: 1V incline and is shown below. Maximum Allowable Slope

Get Quotes

SLOPING AND BENCHING SYSTEMS - National Institute of ...

SLOPING AND BENCHING SYSTEMS OBJECTIVES Upon the completion of this section, the participant should be able to: 1. Describe the difference between maximum allowable slope and actual slope. 2. Observe how the angle of various sloped systems varies with soil type. 3.

Get Quotes

1926 Subpart P App B - Sloping and Benching | Occupational ...

This appendix contains specifications for sloping and benching when used as methods of protecting employees working in excavations from cave-ins. The requirements of this appendix apply when the design of sloping and benching protective systems is to be performed in accordance with the requirements set forth in § 1926.652(b)(2). (b) Definitions.

Get Quotes

EXCAVATION (SHORING & SLOPING) SAFETY PROCEDURE - Tata Power

(1.5Mt) level may be sloped to preclude collapse, but shall not be steeper than a 1 feet (0.3Mt) rise to each ½ feet (0.15Mt) horizontal. When the outside diameter of a pipe is greater than 6 feet (1.8Mt), a bench of 4 feet (1.2Mt) minimum shall be provided at the toe of the sloped portion.

Get Quotes

A Formula for Sloping Ground Pole Setting | Transmission ...

An approach to pole setting on sloping ground For poles set on continuously sloping ground, or at the top of a road ditch, there is a loss of lateral soil support on the downhill side of the pole. Fig.1 illustrates this loss of support and how it can be replaced.

Get Quotes

CEN-EHS129 Trenching and Shoring Practice - cenovus.com

9.0 Trench Entry and Exit Points. In trenches 1.2 metres or deeper, adequate means of entry and exit must be provided; a ladder, a ramp, or steps are to be no more than 8 metres from the worker. In the case of a ladder, the stringers are to extend 1 metre above the ground level to facilitate trench entry and exit.